Please or Register to create posts and topics.

Change order of stops made easier

In planning mode, is it possible to have an easier/quicker way of changing the order of single stops?

As far as I have seen, currently this is only possible by selecting a stop so the cursor sits at the correct spot, delete the stop and assign a new stop where you can define the previous stop.

 

Thanks and kind regards, David

There is a slightly quicker way.... when you tap on a stop, a bubble appears with 4 buttons.

From left to right these are the functions of those buttons:

  1. Edit the name of the stop
  2. Convert the stop into a via point
  3. Move the stop (you will be asked to move the map to the new location and tap OK)
  4. Delete the stop

Later in Scenic 3 I will also add a list of stops where you can easily change the order of stops and Vias.

Old Man Emu has reacted to this post.
Old Man Emu
If you're enjoying Scenic and are happy with the support, please leave a nice rating in the App Store. It would mean a lot to me ❤️

I know the 4 options when tapping on a stop. Thats how I delete the stop to then make a new one with the new, corrected stop-number.

Or what exactly do you mean?

 

But when Scenic 3 has that list of stops where the order can be easily changed I am more than happy 🙂
Really looking forward to Scenic 3!!!

Sorry... I read your question wrong. I answered how to move the location of the stop, while you were asking about chaining the order of stops.

If you're enjoying Scenic and are happy with the support, please leave a nice rating in the App Store. It would mean a lot to me ❤️

Ah yes, exactly 🙂

On one iPhone I use, I am stuck with Scenic 2 and having become very frustrated with the bizarre route it was creating, I realised that it was adding new stops/vias  BEFORE the others, instead of maintaining a sensible order. I then tried to reorder them, but was unable to.

Is it actually impossible to reorder a route in Scenic 2?

Quote from BiKenG on 06.07.2022, 04:18

On one iPhone I use, I am stuck with Scenic 2 and having become very frustrated with the bizarre route it was creating, I realised that it was adding new stops/vias  BEFORE the others, instead of maintaining a sensible order. I then tried to reorder them, but was unable to.

Is it actually impossible to reorder a route in Scenic 2?

I’m afraid so. The stop/via reorder feature  was added in Scenic 3.

David_G and Old Man Emu have reacted to this post.
David_GOld Man Emu
If you're enjoying Scenic and are happy with the support, please leave a nice rating in the App Store. It would mean a lot to me ❤️

Thats so awesome, I love it!!

Have used that feature quite a lot in the meantime 😉

Thanks Guido!

 

Is there also a possibility to change the order during a navigation? In case one included a stop in the wrong order.
I think I found that option somewhere in the past, but I can't seem to find it now.

Indeed a similar feature existed during navigation in the past. But I removed it. It's still on the list to add it back, but will be a while I'm afraid. Until that time you'll have to remove and re-add in different spot manually through the map (in navigation edit mode). Double tap map during navigation to go to edit mode.

David_G has reacted to this post.
David_G
If you're enjoying Scenic and are happy with the support, please leave a nice rating in the App Store. It would mean a lot to me ❤️

Minor item I noticed in the re-ordering dialog;

Start is shown with the Checkered Flag and End is shown with the Green Flag

Oh. Just tried this. You are right 🙄. This happens when a route is reversed.

Old Man Emu has reacted to this post.
Old Man Emu
If you're enjoying Scenic and are happy with the support, please leave a nice rating in the App Store. It would mean a lot to me ❤️

So how do I reorder in Version 4? What am I missing? Same issue when using the App on my Mac.

 

Quote from TotalEgal on 09.11.2024, 17:31

So how do I reorder in Version 4? What am I missing? Same issue when using the App on my Mac.

 

Vias Anzeigen > Bearbeiten

If you're enjoying Scenic and are happy with the support, please leave a nice rating in the App Store. It would mean a lot to me ❤️